摘要:正 1 前言在过去的几年中,泰国经济以一个前所未有的步伐迅速增长。为满足国家经济的迅速发展,泰国能源部门已策划制定并通过了一个宏大的能源发展计划。在这个计划范围内,大量新增装机容量将是一些很大容量的联合循环发电厂,其中一座规模最大的电厂目前正在运行建设之中,它座落在泰国的Bangkok东南100公里的Rayong Abstract:In the past few years, Thailand's economy has rapidly increased at an unprecedented pace in the past few years. In order to meet the rapid development of the national economy, the energy sector in Thailand has been planning and through the development of a huge energy development plan. Within the scope of the plan, a lot of new installed capacity will be some of the large capacity combined cycle power plant, which a city the size of the largest power plant is currently running construction. It is located in the 100 km southeast of Bangkok of Thailand Rayong 引言:1前言 在过去的几年中,泰国经济以一个前所未有的步伐迅速增长。为满足国家经济的迅速发展,泰国能源部门已策划制定并通过了一个宏大的能源发展计划。 在这个计划范围内,大量新增装机容量将是一些很大容量的联合循环发电厂,其中一座规模最大的电厂目前正在运行建设之中,它座 ,泰语论文题目,泰语论文网站 |